Tuesday, 14 February 2012

Week 11, Day 75 - Lock-Up complete - we're sailing through!

Well, it's amazing how things can change so much in a matter of hours!!!

The plasterers arrived mid morning on Monday to begin work.  We snuck a look just after 1pm, thinking that there may be one or two rooms plastered, only to find every room in the house with plaster sheets at least half way up the walls.  We returned later that evening to find that they had installed all walls and ceiling plaster throughout the whole house!  I guess it brings some truth to the saying 'many hands make light work' given there was a bus load of people working today!!!

Once again, it's changed the feel of the house, with some rooms appearing quite a bit smaller, while the main living areas and garage/studio feel really big!  No doubt it will all feel different again once the walls and ceiling have been painted and things "open-up" once again.

These photos are all over the place, as I don't know how to rearrange them!!!

Rumpus Room
Looking back into the main living area from the rumpus room
Double sliding doors of dining area 
Kitchen before the fridge cavity had been plastered
Lounge room / Office Space
Looking back towards the front door
Entry way, looking to main living areas
Studio Space, rear door opening
Main bathroom 
Standing at the kitchen island bench location,
looking to dining & family rooms
(rumpus room is the one with the void & door way)
Master bedroom window
Looking into the ensuite from the master bedroom,
walk-in robe to the left
Kitchen looking into walk-in pantry & fridge cavity.
Photo taken from roughly where the island bench will be

Studio Space with Powder Room & Entry to the House